How to safely discuss prepayment with a Chinese factory
Prepayment to a Chinese factory is not a matter of trust, but a manageable procedure. We break down what to check before talking about percentages, how to formulate advance payment terms without conflict, and which tools reduce risk without damaging working relationships.
Mikhail Ansimov12 min readThe word "prepayment" in a conversation with a Chinese factory almost always carries extra emotional charge. For the buyer, it is money that goes out in advance — that is, risk. For the factory, it is money used to purchase raw materials and start the line — that is, protection. As long as both sides discuss not the percentage but mutual fears, the conversation goes in circles. As soon as prepayment becomes a deal parameter on par with price, volume and lead times, discussing it becomes simpler and safer.
Why prepayment became a subject of negotiation in the first place
A foreign buyer working with a Chinese supplier for the first time often conflates three different things that are denoted by the single word "advance".
First — the advance as a way of financing production. The factory receives the money and uses it to buy material, dye, packaging, and pay for the line's work. In this logic, prepayment is not a test of the buyer's honesty, but working capital. The factory protects itself from a situation where the batch has already been produced and the buyer has changed their mind about purchasing it.
Second — the advance as a signal of seriousness of intent. In this role it works both ways: a buyer willing to transfer money is perceived as a party that really intends to order, rather than to collect quotes for comparison.
Third — the advance as a risk-sharing tool. The higher the percentage, the more risk on the buyer; the lower it is, the more risk on the factory. This is not a moral category, but simple arithmetic, and it is precisely because of this that the advance percentage is always tied to price.
The main question of this article is: how to conduct a conversation about prepayment so as not to lose money and not to spoil working relationships. The answer begins not with the percentage, but with verification — because discussing the size of the advance with a counterparty you have not vetted is pointless.
What to check before talking about percentages
Verification of the counterparty and bank details is not an expression of distrust. It is a standard procedure of international settlements, and in China it is treated calmly if it is presented as a procedure, not as suspicion.
The first thing worth cross-checking is that the company name matches across three documents: in the contract, in the invoice and in the bank details. A discrepancy between these three points is one of the most common signs of a fraudulent scheme. If the contract names one company, the invoice is issued by another, and the money is requested to be transferred to a third, this is a reason to stop and sort it out, rather than to "avoid awkwardness".
The legal entity's status is worth checking separately. In China there is a public company registry where you can verify basic information about a registered enterprise. Having an export license is a separate question, and it is worth asking directly: not every factory has the right to direct export; some work through trading companies. This is not necessarily bad, but you must understand exactly whom you are concluding the contract with.
The bank account must be opened in the name of the selling company. A request to transfer money to an individual's account or to a third-party firm is a signal that should be taken seriously. Sometimes this is not fraud but the internal structure of a group of companies, but this needs to be sorted out before the transfer, not after.
All these questions can be asked politely and in a businesslike tone. The wording "we need to verify the bank details for the bank" sounds neutral and contains no accusation. In Chinese business practice, procedural explanations are received better than emotional ones.
How to frame the conversation about prepayment without escalating
The direct question "why do you require 50%" almost always sounds like an accusation, even if you did not mean it that way. It puts the counterparty in a position where they have to justify themselves. It is far more productive to reformulate it as a question about the payment structure: how the payment scheme is arranged, which events the tranches are tied to, what happens in case of deviation from the specification.
In negotiations about the advance, a simple rule applies: a change in the percentage is almost always exchanged for another term. Reducing the advance from 50% to 30% usually means either a higher price, or a larger order volume, or stricter lead-time terms. If you ask to reduce the advance and offer nothing in return, in Chinese negotiating logic this reads as an attempt to get a concession for free — and a concession without a counter-concession is often perceived as a sign of a weak position, not as a gesture of goodwill.
Typical schemes look roughly like this. For a small order or a first contact, the factory may insist on full prepayment — for it, this is a way to avoid dealing with a small batch without guarantees. The 30/70 scheme (advance upon signing, balance before or after shipment) is a common option for medium-sized orders. The 50/50 scheme is encountered less often and is usually tied to custom production, where the factory incurs increased setup costs. As order history accumulates, terms tend to soften, but this is not an automatic process, but the result of negotiations.
It is important to understand that specific percentages vary greatly by industry and depend on order size, material and factory workload. The claim that "all Chinese factories require 30%" is incorrect. Therefore the conversation should be conducted not about whether the percentage is "correct", but about what terms accompany it.
What should be in the contract alongside the prepayment figure
The advance figure by itself means little. The safety of the deal is determined not by the percentage, but by which events the payments are tied to and what happens in case of deviation from the agreements.
It is better to tie the payment schedule to events, not to dates. "Advance within five days after signing" is clearer than "advance by the end of the month". "Balance after successful inspection before shipment" protects the buyer better than "balance within 30 days after shipment".
Shipping terms and the moment risk passes are what determine who is responsible for the goods at each stage. The advance figure without these terms becomes a formality: you may pay 30%, but if risk passes to you at the moment when the goods are still in the factory's warehouse, the saving on the advance does not compensate for the loss of control.
The right to inspect before the final payment should be fixed separately: who conducts the check, according to which specification, what counts as non-conformity and what consequences follow. The inspection can be conducted by your representative, a third party or jointly — it is important that this be spelled out, not implied.
The procedure for returning the advance in case of production failure or non-compliance with the specification is a topic that is awkward to raise, but it is precisely this that determines what happens in a conflict situation. Recovery in China is possible, but requires time and procedures, so it is better for the mechanism to be described in advance. Specific timelines and procedures for judicial recovery depend on the jurisdiction and require separate legal review — I will not undertake to give exact figures here.
Tools that reduce risk without conflict
A letter of credit (L/C) is a standard instrument of international trade in which the bank undertakes to pay for the shipment when the stipulated conditions are met. For the buyer, this is a way not to transfer money directly in advance; for the factory, it is a guarantee of payment. However, a letter of credit is not always accepted: it requires additional costs and paperwork, and small factories or factories with high workload may refuse it. The claim that a letter of credit is "always" accepted is incorrect — it depends on the industry, the order size and the factory's willingness to work with banking instruments.
Third-party inspection before shipment is a way not to pay for defects. An independent inspection company checks the batch against the agreed specification and issues a report, on the basis of which you make the decision about the final payment. This does not replace verification of the counterparty, but it reduces the risk of receiving something other than what you ordered.
Splitting the order into batches allows you to reduce the first advance: instead of one large prepayment, you pay for the first batch, check the quality, and only then order the next one. This lengthens the timeline and may increase the cost, but it reduces risk at the start.
A gradual transition from a high prepayment to softer schemes as order history accumulates is a natural process. A factory that sees that you pay on time and do not create problems with acceptance may over time agree to terms more comfortable for you. This is not a guarantee, but a tendency that depends on the relationship and the stability of orders.
Typical mistakes when discussing prepayment
One of the most common mistakes is transferring to an account that does not match the company name in the contract. Even if this is explained to you by internal reasons, the risk is too great to take it on faith without verification.
The second mistake is oral agreements about returning the advance without fixing them in the contract. In Chinese business practice, oral promises can carry weight in the relationship, but in a conflict situation they do not replace written terms. If the return mechanism is not spelled out, it is difficult to count on it.
The third mistake is trying to knock down the advance percentage without offering a counter-term. As already mentioned, a concession without an exchange is perceived as a weak position, and this may affect other terms of the deal.
The fourth mistake is perceiving the prepayment requirement as personal distrust and shifting into an emotional tone. A factory that asks for an advance most often protects its production cycle, rather than doubting your honesty. An emotional reaction here only makes the conversation harder.
The fifth mistake is ignoring the link between prepayment terms and price. Reducing the advance often means a higher price: the factory compensates for the increased risk. If you do not take this into account, the final cost of the deal may turn out to be higher than under the original terms.
What this gives in practice
Prepayment is a deal parameter that is discussed together with price, volume and shipping terms, not separately from them. Understanding this changes the tone of the conversation: you stop haggling over the percentage and start discussing a payment structure tied to events and inspections.
Before transferring money, it is worth asking yourself several questions. Does the company name match in the contract, invoice and bank details? Has the legal entity's status been verified? Which events are the payments tied to? Who conducts the inspection and according to which specification? What happens in case of production failure? If these questions have answers in the documents, and not only in the correspondence, the risk is reduced.
A calm, procedural tone on these matters in China is usually perceived as a sign of a serious buyer. A person who asks specific questions about bank details, inspection and shipping terms looks not like a suspicious client, but like a professional with whom one can do business. This is perhaps the main practical conclusion: safety in a conversation about prepayment is achieved not by caution in wording, but by clarity of procedures.
FAQ
Is it possible not to pay prepayment at all?
In some cases — yes, but it depends on the industry, the order size and the history of the relationship with the factory. For a first order and a small batch, the factory more often insists on an advance. Working entirely without prepayment is usually done either through a letter of credit, or with long-term cooperation and large volumes.
What should I do if the factory asks to transfer money to an individual's account?
Stop and sort it out. The account must be opened in the name of the selling company. If this is explained to you by internal reasons, ask for an official letter or document confirming the connection. Without such confirmation, transferring money is risky.
Is a letter of credit always better than a direct advance?
No. A letter of credit protects the buyer, but requires additional costs and paperwork, and not every factory is ready to work with it. For small orders or factories with high workload, a direct advance with inspection may prove more practical.
Can the prepayment be returned if the factory fails to fulfil the order?
A refund is possible, but depends on the contract terms and the jurisdiction. If the return mechanism is spelled out in the contract, the chances are higher. Recovery in China requires time and procedures, so it is better to fix the return terms in advance, rather than rely on oral agreements.
Is prepayment linked to price?
Yes, almost always. Reducing the advance increases the factory's risk, and it often compensates for this with a higher price or other terms. Therefore the advance percentage should be discussed together with price and volume, not separately.